3 Basque Road, Auckland

  • image 01
  • image 01
  • image 01
  • image 01
  • image 01
  • image 01

Client

Dawven Limited

Value:

$2.6 million

Construction Period

May 2012 - March 2013

Details:

Clearwater successfully delivered this design-build project utilizing the sister companies capabilities; DHC Consulting for the structural design and D&H Steel Construction for the structural steel fabrication and installation.

Clearwater added two floors to an existing two-floor structure to create four floors of apartments at 300m² each, above a undercroft car park. The design and construction was made complicated by the need to consider the exacting measures for materials such as structural steel and comflor in order to work in with the older, existing structure. 

The final product is a 36 one-bedroom, studio style apartment complex to suit short-term accommodation.