Thompson Park Apartments, Auckland

  • image 01
  • image 01
  • image 01
  • image 01
  • image 01
  • image 01
  • image 01
  • image 01

Client

Thompson Park Holdings

Value:

$28 million

Construction Period

January 2014 - March 2016

Details:

Clearwater Construction entered in to a negotiated design-build contract to deliver this project comprising 107 apartments across two towers of five floors each.
This development is located in the Auckland suburb of Mt Wellington, upon the site of an old Mercury Energy building. The apartments apply principles of adaptive re-use to create a unique development utilizing existing structure.

Construction involved a mixture of structural steel, precast concrete and logicwall for the structural elements and aluminium joinery, cedar and ACP for the building envelope.
The exterior of the apartments incorporates a strongly defined entrance using repeating dark louvers with cedar highlights, breaking up the horizontal form of the building. Generous communal areas are provided with units designed for light, outlook and privacy

Thompson Park Apartments in Mt Wellington won the Multi-unit Dwelling category providing "a credible solution to a complex pressing problem and a step in the evolution of urban living in New Zealand".