![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2019/12/Nixon-05-August-2017-final-18-2.jpg)
Service
Design & Build (Structure & Services)
Client
Central 8 Trust
Construction Period
August 2016 – July 2017
(2 stages)
Value
$7.3M
Architect
Paul Brown Architects
Engineer
DHC Consulting
Project Details
- Design & Build (Structure & Services)
- A small site in a prime location close to Kingsland’s transport hub has yielded a compact development of 16 two bedroom apartments over 4 levels, which maximises height and density opportunities in this mixed-use zone.
- Structure consisted of structural steel, precast concrete panels and a ribbon infill flooring system
- On the exterior, a hard-wearing industrial palette of painted precast panels, timber soffits and metal privacy screens offer design solutions which are both practical and distinctive.
- Project completed 1 month ahead of schedule
![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2019/11/Nixon-05-August-2017-final-8-1.png)
![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2019/12/Nixon-05-August-2017-final-4.jpg)