![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2020/02/DH-Cinema-Newmarket-6.jpg)
Service
Specialist Structural Contractor
Client
Scentre Group
Construction Period
2018-2019
Value
$65M
Architect
Scentre Group Project Design
Engineer
DHC Consulting
Project Details
- Specialist Structural Contractor
- 70,000sqm retail, 20,000sqm parking
- Clearwater provided a super-sub package for the stucture which included the supervision and construction of all foundations, structural steel frame and floors.
![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2020/02/DH-Cinema.jpg)
![](https://www.clearwaterconstruction.co.nz/wp-content/uploads/2020/02/IMG_1083-scaled.jpg)