Sealink HQ

Sealink HQ

ServiceDesign & Build  ClientWynyard West Limited Construction PeriodApril 2023 – July 2024(2 stages) Value$10M ArchitectArchitectus Auckland EngineerDHC Consulting Project Details Design & Build 2 suspended levels (500sqm foot print) of ComFlor...
32 Oxford Terrace – Christchurch

32 Oxford Terrace – Christchurch

Service Design & Build Client Countrywide Group Construction Period August 2014 – September 2015 Value $18M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build5,500sqm of A-grade office space on upper 4 levels over 1,300sqm...
Greenlane Office Building

Greenlane Office Building

Service Construction Client Kimberley Trust Construction Period 2018 onwards (staged) Value $24M Architect Brewer Davidson Engineer Thorne Dwyer Project Details ConstructionStage 1 – Basement parking and podium levelsStage 2 – 4 level office tower...
ASB – Lincoln Rd – Henderson

ASB – Lincoln Rd – Henderson

Service Design & Build Client Vaco Investments Construction Period December 2011 – September 2012 Architect Pacific Environments Engineer DHC Consulting Project Details Design & Build.Construction involved bulk excavation for the undercroft car park with...
83 Victoria St – Christchurch

83 Victoria St – Christchurch

Service Design & Build  Client Countrywide Group Construction Period June 2012 – October 2013 Value $13M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build3,000sqm of premium office space on upper  5 levels over  600sqm of...
Downer Group – Manukau

Downer Group – Manukau

Service Design & Build Client Downer Group Construction Period 2011 Value $5.4M Architect AQUA Architecture Engineer DHC Consulting Project Details Design & Build.3,430sqm high specification 3 level office over basement parking.Early engagement of lead...
50 Victoria St – Christchurch

50 Victoria St – Christchurch

Service Design & Build Client Countrywide Group Construction Period August 2013 – March 2014 Value $4.5M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build1,200sqm of premium office space on upper  3 levels over  400sqm of...
123 Victoria St – Christchurch

123 Victoria St – Christchurch

Service Design & Build Client Countrywide Group Construction Period April 2016 – March 2017 Value $25M Architect +MAP Architects Engineer DHC Consulting Project Details Design & BuildThe project comprises of 7,000sqm of premium office space, spread over...
52 Broadway, Newmarket

52 Broadway, Newmarket

Service Construction Client The Gregory Family Trust Construction Period February 2014 – August 2014 Value $6M Architect AQUA Architecture Engineer DHC Consulting Project Details ConstructionThe two existing buildings were stripped back to the structure;...
104 Victoria St – Christchurch

104 Victoria St – Christchurch

Service Design & Build  Client Countrywide Group Construction Period October 2013 – July 2014 Value $9M Architect +MAP Architects Engineer DHC Consulting Project Details Design & Build2900sqm of A-grade office space on upper 4 levels over 730sqm of...
159 King St – Pukekohe

159 King St – Pukekohe

Service Design & Build  Client Garner Family Trust Construction Period August 2014 – January 2015 Value $0.8M Architect Architectural Design Consultants (2001) Engineer DHC Consulting Project Details Design & BuildSingle level office constructed on...